typical works
• Transport machinery and equipment to site
• Excavate to clear the proposed site disposing of material off site
• Supply and place formwork
• Supply and place Visqueen to the formwork
• Supply and install A393 (10mm) reinforcing mesh
• Supply and place to a float finish 11m³ of C40 concrete
• Remove the shuttering and stone up around the concrete
• Tidy up and exit from site